Memo
Date: November 16, 2009
To: Dr. Carla Kungl
From: Ship Room Raters
Subject: Status Report
Purpose
This
is a status report based on the current progress we have and are making on our
website.
Summary
We
have been accumulating research on potential Shippensburg off-campus housing
through websites and surveys handed out to current students. We have begun to
work on the website and we are currently about half way done. We have completed
the home page as well as the individual homepages for the individual sites
contained within. We still have to analyze the data from the surveys we have
received back and include it in our website. We are currently on schedule to
complete the website and present it to the class on December 11, 2009.
Introduction
Last
month we decided to create a website that would provide Shippensburg students
with a resource to turn to when looking for new housing around Shippensburg. We
obtained permission to pursue this website on October 28, 2009. Since then we
have continued to obtain research on the topic and follow through to allow our
site to be as thorough as possible. We
believe we are qualified and determined group.
Research
Task 1: Work
Schedule.
The work schedule has been continually altered and adjusted based on the time
it has taken to accomplish each task.
Task 2. Created
logo and letterhead.
The logo and letterhead were created in Adobe indesign on September 25, 2009.
Task 3. Gantt
Chart.
The Gantt chart was created organize and demonstrate tasks and their expected
date of completion.
Task 4.Work
Plan.
The work plan was drafted, proofread, and submitted as a memo to Dr. Kungl on
October 2, 2009. The work plan included both the work schedule and the Gantt
chart and information about our group policies, project leader, and activities.
Task 5.
Proposal. We
created a thorough explanation of what we wish to accomplish with our website.
The proposal was completed on October 28th, 2009. The proposal
elaborated on our goals, described the website, and our qualifications to
complete such a task. The proposal also included a flow chart of our site, a
mock sketch of what the site will look like, and a copy of the survey we
planned to hand out to Shippensburg students. Permission was granted to pursue
the website based on our proposal.
Task 6. Secondary
Research.
We sifted through data that was already available to us through websites,
brochures and other promotional materials from each housing unit. We obtained
information on many topics such as price, amenities, locations, and more. We
have completed our primary research on the housing units.
Task 7. Primary
Research.
After we were granted permission to do the site, we distributed surveys to
Shippensburg students who have lived in off-campus housing around ship. We are
currently still compiling the data from these surveys.
Task 8. Building
the Website.
So far we have created the website’s home page and the individual home pages
for each housing unit. The home page conveniently links to each of the housing
units (Bard Townhouses, Rock Towne Townhouses, College Park Commons). We still
have to create pages for the results of our secondary research and primary
research. We have completed our ‘About Us’ page and our ‘Contact’ page. The
website is roughly around half way finished, and we are on schedule to complete
it on time.
Future work
Task 9.
Usability study.
We will research our classmates’ sites and our own to check for broken links,
errors in spelling, and other potential mistakes.
Task 10.
Presentation.
After our website is completed, we will present the finished product to the
class. We have yet to determine how it will be presented.
Updated Schedule
Below
is an updated copy of our Gantt Chart (Figure A). Additionally, please see
attached updated work schedule (Table 1) for information on hours spent and
hours remaining on each task.
Figure
A. Gantt Chart
Task
|
Date of Tasks
|
||||||||||||||||||
Work Schedule
|
|||||||||||||||||||
Create Logo/Letterhead
|
|||||||||||||||||||
Draft Work Plan
|
|||||||||||||||||||
Proofread Work Plan
|
|||||||||||||||||||
Submit Work Plan
|
|||||||||||||||||||
Gantt Chart
|
|||||||||||||||||||
Secondary Research
|
|||||||||||||||||||
Primary Research
|
|||||||||||||||||||
Draft Proposal
|
|||||||||||||||||||
Proof Web Proposal
|
|||||||||||||||||||
Submit Web Proposal
|
|||||||||||||||||||
Create Survey
|
|||||||||||||||||||
Distribute Survey
|
|||||||||||||||||||
Home page design
|
|||||||||||||||||||
Draft Indiv. Websites
|
|||||||||||||||||||
Usability checks
|
|||||||||||||||||||
Prepare for Presentation
|
|||||||||||||||||||
Presentation
|
|||||||||||||||||||
Weeks
|
1
|
2
|
3
|
4
|
1
|
2
|
3
|
4
|
1
|
2
|
3
|
4
|
1
|
2
|
3
|
4
|
|||
September
|
October
|
November
|
December
|
||||||||||||||||
(The
lightest shade of grey represents beginning the task. As progress is made, a
darker shade is used. Black expresses completion of the task.)
Conclusion
We
have completed tasks 1 through 7. In regards to the website, we are currently
ahead of schedule and we are expecting to finish task 8, which is building the
website, on time. Tasks 9 and 10 will be completed on December 2nd
and December 11th, respectively.
We
have encountered no problems working as a group and we are satisfied with the
current status of our website.